Instant Read Temperature Thermometers Smart BBQ Thermometer with Long Probe
Product Specifications:
tem No.: |
LDT-1819 |
Description: |
Petroleum Concrete Industrial Digital Thermometer With Probe |
Specifications: |
Measuring Range: -40°C to 300°C/-40°F to 572°F Accuracy: ±0.5°C(-10°C to 100°C) ± 1.0°C(-20°C to -10°C)(100°C to 150°C) otherwise ± 2°C Resolution: 0.1°F(0.1°C) Probe Size : Φ4*150mm(Reduced tip probe to 1.8mm) Battery: CR2032*2 Button(1500 hours) Waterproof: IP68 Response: About 4~6 seconds(From 30°C to 100°C) Calibration function Auto power off function Backlight function Max/Min function C/F switchable Auto-off: 1 hour after non operation |
Certificates and Test Reports : |
CE, ROHS, LFGB |
Packaging : |
Brown box (Standard) |
Outer Carton Size : |
38*40*38cm |
QTY./CTN : |
100pcs |
G.W./ CTN : |
15kg |
20GP Container Loading QTY. : |
40000pcs |
Thermometer Details
Product Features and applications
Related thermometers
Company Informations
FAQ
Question 1. What is your main business?
We are supplier of various kinds of thermometers, for example food bbq thermometers, medical thermometers and other household thermometers and hygrometers.
Question 2. Do you provide samples and how much is it?
Yes,,samples are available. Samples need to be paid first, but can be refunded after test and confirm the order for mass production.
Question 3. Can we pay via Paypal? What other payment methods are also available?
Yes, PayPal payment is available for small value orders. T/T, Western Union, and Alibaba trade assurance payment is also welcome.
Question 4. Can we brand with our logo and do our own packaging?
Yes, we can print your logo and do your pacakging based on quantity of 2000pcs each order each design.
Question 5. What is your moq?
We do not have moq for our standard items, but for OEM items(logo printing or customized packaging), our moq is 2000pcs each item.
Question 6. What is your average production lead time?
Standard sample lead time is 1~3 days, if need logo printing or changing some design, the lead time will be as longer as 10~15 days.
Production lead time is 35~45 days after payment received, but we also keep stock for some hot selling items.